Starboard Aft Well Deck

 

Kick strips installed. Vents 61 to 64 are in place. Low rollers added. Bollards have not been moved to correct location yet. Boat Deck supports moved outboard and ladders added to outboard supports. Hatches added either side of No 5 hatch. No 4 Hatches improved. Sun shade cable added on A deck Promenade. All window mullions replaced with K1 strip. (Alas this was done long before Tom brought out the photo etched windows).

 

 
 
This site was created by David Cotgreave January 2000